The reconstruction of the port area in Limassol 2013 built a large rain water channel, which touched the flow of water in the Zakaki Marsh area and Salt Lake.
Promised was a sustainable restoration of the marsh area, the surface of the water and the Habitat of the bird world, even a visitor hide was raised.
Three years later, the reeds abounds hardly more free water surface area, fewer and fewer birds, more and more pollution caused by waste.
Zakaki Pool before and after the redesign of the stormwater inlet in 2013. Nothing of this is visible anymore.
Kommentar schreiben