The reconstruction of the port area in Limassol 2013 built a large rain water channel, which touched the flow of water in the Zakaki Marsh area and Salt Lake. Promised was a sustainable restoration of the marsh area, the surface of the water and the Habitat of the bird world, even a visitor hide was raised. Three years later, the reeds abounds hardly more free water surface area, fewer and fewer birds, more and more pollution caused by waste.
Asprokremmos Dam Juni 2016 - At the left edge of the image, the shore of the dam is at normal water level. On the right-hand side you can see the abandoned village of Finikas. - just click to open and go aronnd for Details